The numbers that appear again and again on EPA Section 608 exams. Each item cites its source. Confirm current rules in the regulation before relying on them in the field.
Required evacuation levels (in Hg vacuum)
Measured in inches of Hg vacuum relative to standard atmospheric pressure (29.9 in Hg). Columns show the date the recovery equipment was manufactured or imported.
| Appliance type | Recovery equipment made before Nov. 15, 1993 | Recovery equipment made on or after Nov. 15, 1993 |
|---|---|---|
| Very high-pressure appliance (e.g. R-13, R-23, R-503) | 0 | 0 |
| High-pressure appliance (e.g. R-22, R-410A, R-407C, R-502), or isolated component, full charge less than 200 lb | 0 | 0 |
| High-pressure appliance, or isolated component, full charge 200 lb or more | 4 | 10 |
| Medium-pressure appliance (e.g. R-12, R-134a, R-500, R-114, R-124), or isolated component, full charge less than 200 lb | 4 | 10 |
| Medium-pressure appliance, or isolated component, full charge 200 lb or more | 4 | 15 |
| Low-pressure appliance (e.g. R-11, R-123, R-113, R-245fa) | 25 mm Hg absolute | 25 mm Hg absolute (about 29 in Hg vacuum) |
Source: 40 CFR 82.156(a), Table 1.
Small appliances, MVACs and MVAC-like appliances are not covered by this table. MVAC-like appliances and MVACs being disposed of: evacuate per 40 CFR part 82 subpart B or to 102 mm Hg vacuum or lower (40 CFR 82.156(c)-(d)).
Small appliances (Type I)
- Recovery equipment made before Nov. 15, 1993: recover 80% of the refrigerant. Equipment made on or after Nov. 15, 1993: recover 90% when the appliance compressor works, or 80% when it does not. Or evacuate the appliance to 4 in Hg vacuum. (40 CFR 82.156(b))
- System-dependent recovery equipment may not be used on appliances with a full charge of more than 15 lb unless it is permanently attached as a pump-out unit. (40 CFR 82.156(e))
Leak repair: ozone-depleting refrigerants (40 CFR 82.157)
This is the rule the EPA 608 exam is built around. It covers appliances with a full charge of 50 lb or more of a CFC or HCFC refrigerant such as R-22, R-123 or R-12. Repair when the leak rate, calculated each time refrigerant is added, exceeds:
- Industrial process refrigeration (IPR): 30%. (40 CFR 82.157, EPA – Stationary refrigeration leak repair)
- Commercial refrigeration: 20%. (40 CFR 82.157, EPA – Stationary refrigeration leak repair)
- Comfort cooling and other appliances: 10%. (40 CFR 82.157, EPA – Stationary refrigeration leak repair)
- Covered: appliances with a full charge of 50 lb or more of an ozone-depleting refrigerant. Since April 10, 2020, this rule no longer covers appliances that contain only substitute refrigerants such as HFCs. (40 CFR 82.157)
- Repair within 30 days (120 days if an industrial process shutdown is required) of adding refrigerant to an appliance that exceeds its leak rate, and confirm with an initial and a follow-up verification test. (40 CFR 82.157)
- A retrofit or retirement plan is due within 30 days and the work completed within 1 year. (40 CFR 82.157)
- After a repair, leak inspections are quarterly for commercial and IPR appliances of 500 lb or more, and once per calendar year for the others, until the leak rate stays below the trigger. (40 CFR 82.157)
- Chronic leaker: an appliance leaking 125% or more of its full charge in a calendar year must be reported to EPA by March 1 of the following year. (40 CFR 82.157)
Leak repair: HFCs and other substitutes (40 CFR 84.106, since Jan 1, 2026)
A separate AIM Act rule, in force since January 1, 2026. Good to know in the field; the 608 exam may still focus on the 82.157 rule above.
- Covers appliances with a full charge of 15 lb or more of an HFC (for example R-410A, R-404A, R-407C, R-134a, R-454B) or a substitute with GWP above 53. Not covered: appliances containing only ozone-depleting refrigerant (82.157 applies instead), residential and light commercial AC and heat pumps, and refrigerants with GWP of 53 or less such as R-1234yf or CO2. (40 CFR 84.106)
- Same trigger rates: 30% IPR, 20% commercial refrigeration, 10% comfort cooling, refrigerated transport and other appliances. (40 CFR 84.106)
- Same deadlines: repair within 30 days (120 days for an IPR shutdown), initial and follow-up verification tests, and a retrofit or retirement plan within 30 days completed within 1 year. (40 CFR 84.106)
- Chronic leakers with 15 lb or more that leak 125% or more of their full charge in a calendar year must be reported to EPA by March 1 of the following year. (40 CFR 84.106)
- Automatic leak detection is required on commercial refrigeration and IPR appliances with 1,500 lb or more: at installation for systems installed from Jan 1, 2026, and by Jan 1, 2027 for systems installed from 2017 through 2025. (40 CFR 84.108)
- Owners must document the full charge of each appliance of 15 lb or more (by Jan 1, 2026, or at installation) and keep leak repair records for 3 years. (40 CFR 84.106)
- Status as of November 2026: EPA proposed in May 2026 to exempt road and intermodal transport refrigeration units and says it will reconsider other parts of the 2024 rule. Check eCFR for the current text. (EPA – Regulatory actions for managing HFC use and reuse, 40 CFR 84.106)
Cylinders and handling
- Never fill a recovery cylinder beyond 80% of its capacity. Recovery cylinders are painted gray with a yellow top. (40 CFR 82.158, EPA – Section 608)
- Use nitrogen (never air or oxygen) for leak testing. (EPA – Section 608)
- When charging a chiller, charge refrigerant as vapor before liquid. (EPA – Section 608)
Low-pressure systems
- Evacuate low-pressure appliances to 25 mm Hg absolute. (40 CFR 82.156(a), Table 1)
- Pressurize for leak testing to no more than 10 psig; the rupture disc relieves at 15 psig. (EPA – Section 608)
- Change oil only when the system is at 5 psig or less. Heat the oil to about 130°F to drive off dissolved refrigerant. (EPA – Section 608)
Recordkeeping
- Keep service and disposal records for 3 years. (40 CFR 82.157, 40 CFR Part 82, Subpart F, Appendix D)
This sheet summarizes published EPA requirements for study purposes. Test content and regulations can change; check epa.gov/section608 and your certifying organization.