Leak repair requirements and timelines. This page draws 10 questions from the 10 sourced Type III questions we have on leak repair requirements; each answer explains why and links to the rule it tests.
On the real test: Every Type III section on the real exam has 25 questions drawn across all Type III topics, and you need 18 of 25 (70%) on the closed-book test. Our bank has 10 practice questions on this topic. Expect questions like: “A low-pressure centrifugal chiller cooling an office building with 1,000 lb of R-123 falls under which leak-rate trigger?” and “A low-pressure chiller used to cool an industrial process (e.g., a chemical plant) with 50+ lb falls under which trigger rate?”
Key facts to remember
- Chronic leaker report 125% of full charge in a year, report by March 1 (source)
- Leak rate trigger: comfort cooling 10% (source)
- A low-pressure centrifugal chiller cooling an office building with 1,000 lb of R-123 falls under which leak-ra 10% comfort cooling (source)
- A low-pressure chiller used to cool an industrial process (e.g., a chemical plant) with 50+ lb falls under whi 30% (source)